Medical Educational Institutions
Esi-pgimsr, Medical College & Hospital And Odc(ez) Joka, KolkataWhat's New
- Tender
- Circular
- Recruitment
- Home
- /
- Infrastructure
Infrastructure
Lecture Theaters
- College Building 4th Floor: 150 capacity, Gallery Type
- College Building 5th Floor: 250 capacity, Gallery Type
- College Building 6th Floor: 120 capacity, Gallery Type
- College Building 7th Floor: 120 capacity, Gallery Type
- Old Hospital Building 9th Floor: 150 capacity, Gallery Type
Examination Hall
- College Building 2nd Floor: 250 capacity
Students' Hostel (MBBS)
- Boys’ Hostel 1 Block (G+15), with 32 rooms in each floor (within College Campus)
- Girls’ Hostel 1 Blocks (G+15), with 32 rooms in each floor (within College Campus)
Interns' Hostel
- Intern Boys’: capacity 100 (within College Campus)
- Intern Girls’: capacity 50 (within College Campus)
Students' Hostel (Post-Graduate)
- Boys’ Hostel (within College Campus), 5 students presently accommodated
- Girls’ Hostel (within College Campus), 3 students presently accommodated
Resident Hostel
- 70 capacity (within College Campus)
Doctors', Nurses' & Paramedical Staff Quarters
- 64 apartments (within College Campus)
Sports and Recreation Facilities
- Playground for Badminton, Volleyball, Football
- Gymnasium facilities
Teaching Bed Distribution (Total 490 beds)
- General Medicine: Male Ward 60 beds (7th Floor of Old Hospital Building) and Female Ward 60 beds (4th Floor of Old Hospital Building), Total 120 beds managed by 4 units
- Pediatrics: 30 beds (3rd Floor of Old Hospital Building) and 30 beds (5th Floor of New Hospital Building), Total 60 beds managed by 2 units
- TB & Chest: Male Ward 6 beds (6th Floor of New Hospital Building) and 6 beds (5th Floor of New Hospital Building), Total 12 beds managed by 1 unit
- Skin & VD: Male Ward 6 beds (6th Floor of New Hospital Building) and 6 beds (5th Floor of New Hospital Building), Total 12 beds managed by 1 unit
- Psychiatry: Male Ward 6 beds (6th Floor of New Hospital Building) and 6 beds (5th Floor of New Hospital Building), Total 12 beds managed by 1 unit
- General Surgery: Male Ward 60 beds (6th Floor of Old Hospital Building) and Female Ward 60 beds (5th Floor of Old Hospital Building), Total 120 beds managed by 4 units
- Orthopedics: Male Ward 30 beds (6th Floor of New Hospital Building) and Female Ward 30 beds (8th Floor of Old Hospital Building), Total 60 beds managed by 2 units
- Eye: Male Ward 6 beds (6th Floor of New Hospital Building) and 6 beds (5th Floor of New Hospital Building), Total 12 beds managed by 1 unit
- ENT: Male Ward 6 beds (6th Floor of New Hospital Building) and 6 beds (5th Floor of New Hospital Building), Total 12 beds managed by 1 unit
- Obstetrics & Gynecology Antenatal Ward: 30 beds (2nd Floor Old Hospital Building), Total 30 beds managed by 2 units
- Postnatal & Family Planning Ward: 30 (3rd Floor of Old Hospital Building), Total 30 beds managed by 2 units
- Gynecology Ward: 30 beds (2nd Floor Old Hospital Building), Total 30 beds managed by 2 units
Intensive Care Beds
- NICU and PICU: 14 beds (3rd Floor of Old Hospital Building)
- Medical ICU (MICU): 6 beds (6th Floor of Old Hospital Building)
- Surgical ICU (SICU): 6 beds including 2 beds for Obstetric Critial Care (6th Floor of Old Hospital Building)
- Postoperarative Recovery Ward: 4 beds (3rd Floor New Hospital Building), 2 beds (5th Floor Old Hospital Building), 1 bed (2nd Floor Old Hospital Building, Total 7 beds
Major Operation Theaters (Total 7)
- General Surgery OT: 1 (3rd Floor of New Hospital Building)
- Orthopedics OT: 1 (3rd Floor of New Hospital Building)
- Gynecology OT: 1 (3rd Floor of New Hospital Building)
- Emergency OT: 1 (3rd Floor of New Hospital Building)
- Obstetrics OT: 1 (2nd Floor of Old Hospital Building)
- ENT OT: 1 (5th Floor of Old Hospital Building)
- Eye OT: 1 (5th Floor of Old Hospital Building)
Minor Operation Theaters (Total 4)
- Casualty OT: 1 (Ground Floor of Old Hospital Building, beside Casualty)
- Surgery OPD OT: 1 (1st Floor of College Building)
- Eye OPD OT: 1 (Ground Floor of Old Hospital Building)
- Septic Labor OT: 1 (2nd Floor of Old Hospital Building)
Labor Room
- Labor table: 2 (2nd Floor of Old Hospital Building)
Central Sterile Supply Department (CSSD)
- 1st Floor of New Hospital Building
- Horizontal Automatic, High Pressure-High Temperature-Vacuum-Assisted Steam Sterilizer (Single Door): 3 nos.
- Horizontal Automatic, High Pressure-High Temperature-Vacuum-Assisted Steam Sterilizer (Double Door): 4 nos.
- Ethylene Oxide Sterilizer: 1 nos.
- ETO Gas Alarm: 1 nos.
- RO Water Treatment Plant (500 LPR): 1 nos.
- Ultrasonic Bath Instrument Processor: 1 nos.
- Automated Instrument Washer Disinfector: 1 nos.
- Automated Instrument Dryer: 1 nos.
- Heat sealing machine: 3 nos.
- Instrument Cleaning Stations with water jets: 2 nos.
- Packing Stations: 4
Practical Laboratories
- Anatomy Dissection Hall and Histology Laboratory
- Physiology Lab.
- Biochemistry Lab.
- Pharmacology Lab.
- FMT Lab.
- Pathology Lab.
- Microbiology Lab.
- Central Research Lab.
Clinical Diagnostic Laboratories
- Clinical Biochemistry Laboratory
- Clinical Pathology Lab.
- Hematology Lab.
- Histopathology & Cytopathology Lab.
- Microbiology Lab.
- Serology Lab.
Diagnostic Radiology
- Static X-Ray Units
- Mobile X-Ray Units.
- USG with Color Doppler
- CT Scan (128 slice)
Central Library
Last updated / Reviewed : 2019-02-18